Dhaka Elevated Expressway's FDC gate exit ramp opened

DailySun || Shining BD

Published: 3/20/2024 7:59:29 AM

The exit ramp of Dhaka Elevated Expressway at FDC gate, adjacent to Karwan Bazar, was opened to traffic today.

Road Transport and Bridges Minister Obaidul Quader inaugurated the ramp.

2

"This is the Eid gift for the city dwellers on behalf of Prime Minister Sheikh Hasina," said Obaidul Quader while addressing the inaugural event. 

Dhaka Elevated Expresway''s FDC gate opened

Mentionable, the 11.5km portion of the expressway was opened to traffic on 3 September 2023.

Shining BD